Lay walling as per manufacturers instructions.
Cover the area under the wall with a polythene sheet so any material falling can be re used.
|
|
 |
 |
Cut the vacuum pack, empty contents into box and aireate for 3 – 4 minutes. |
|
 |
 |
Using suitable gloves take a handful of GEO-fix and rub into joints ensuring that the material is pressed firmly into the joints working an area of approx 4 – 5 sq mtrs at a time. Any material falling onto the polythene sheet below can be re used. |
|
 |
 |
When 4 –5 mtrs of jointing has been completed simply sweep off excess with a soft brush working at a 45 deg angle to the joints to ensure that no material is swept out of the joint. |
|
 |
 |
Protect the material from rain until cured. |